Support / Manufacturing
Traceability
Deciding what evidence is captured at build.
Manufacturing
Traceability defines, per part, what must be recorded when it's built. Not everything needs the same evidence — this keeps the factory's burden proportionate and your records defensible.
Assigning requirements
- Open Traceability and select a part or assembly.
- Tick what must be captured. Options include serial number, lot number, dimensional report, certificate of conformance, material certification, torque values, functional test results and photographs.
- Save. The requirement now travels with the part.
Why per part
A structural bracket may need material certification and a torque report; a decorative cover may need nothing. Assigning at part level avoids blanket requirements nobody follows.
Exporting
The full matrix exports as an OEM-ready PDF or Excel — parts down the side, requirements across the top. Customers with traceability obligations of their own usually ask for exactly this.
Still stuck?
Email [email protected] and a person will pick it up. Include the part number and what you were doing — it saves a round trip.